NECC Summer Special!
GRAND OPENING! CET Mississauga Location
CO-OP Opportunities Await !
Hot Job Course: SAP BOBI
SAP Advance Integration Project Class
NECC SAP Online Training
SAP GLOBAL MEETING ?ORLANDO USA March 2009

SAP Advance Integration Project Class General Information

 A. The current SAP Project Team consists of:

Project Leader – Full time

SAP DBA – Full time

Developer – Full time

Functional Support Manager– Full time*            1 person

MM Functional Support Specialist– Full time*       8 person

SD Functional Support Specialist– Full time*        6 person

FI Functional Support Specialist– Full time*         2 person

BI Functional Support Specialist– Full time*         6 person

HR Functional Support Specialist– Full time*        6 person

SAP Basis Team I Legacy system- Full time*        3 person

SAP Basis Team II Netweaver    - Ful= l time *        3 person

Windows System Administrator – Part time

SAN Administrator– Part time

Unix Administrator– Part time

System Architect– Part time

Data Architect– Part time

 

B. The number of end users (by module: FI, CO, MM, SD, BW/BI HR and in total)

FI/CO =3D 106, MM =3D 331, SD =3D 22, BW/BI =3D 33, HR =3D 40 Total =3D 532 < /o:p>

C. Modified the standard SAP functionality in SAP system
(attach a list of SAP standard objects that have been modified (custom objects))

SAP Standard programs

Includes

Function modules / Groups

User exits

Append structures

Table modifications

Data Element

Data Domain

Clone programs (copy of SAP Standard)

Batch Data Input

Interface programs

D. Languages installed in the system (e.g.: EN, DE, FR, CH…etc.)

Not Use MDMP

Code pages are installed

E. The current Support patch level for ERP and BW/BI

ABAP

BASIS

APPL

HR

Plug-IN

For SAP R/3 4.6C

ABAP, BASIS, APPL Support package #46 for all three

HR Support Package # None

PI =3D SAPKIPZI41 Thru 46

ST-PI =3D SAPKITLQD1 and D2

For SAP BW/BI

SAP_OCCS =3D SAPKD64018

ABAP, BASIS, BW =3D #11

BI_CONT =3D SAPKIBIFP2

ST_PI =3D SAPKITLPS1

 

F.IT Standard Infrastructure Checklist as of Feb 12, 2009

Infrastructure Component

Operating Environment

Product & Version

Compliance
CERTIFIED
Yes or NO

Compliance
Version

Years of experience

Consulting Services
Yes or No

Experience
 
1.Backup and Restore
 1.1 Novell
       Commvault = V5
        ..............
 
 1.2 Microsoft
       Commvault = V5
       ...............
 
 1.3 HP/UX
       HP fbackup=
       ................
 
 1.4 Tape library
       2 libraries - Dell PowerVault 136 LTO library using 6 LTO1 drives (Microsoft and Novell)
       STK 9714 library using 4 DLT drives (HP-UX)
       ..................
 
2.Database
      ...................

 

Team structure

A. MM
-Master Data I
-Master Data II
-PO/PR
-GI
-GR
-WM
..................

B. SD
-Review
 - Project schedule and task list
 - Legacy system/ DB structure
 - Blueprint
-Data Definition
 - Enterprise structure definition
 -  Enterprise structure assignment
-Data Definition
 - Logistics general
 - Master data for customer
 - Partner Determination
-Data Definition
 - Pricing
 - Routes
 - shipping
 - Transport
-Data Definition
 - Sales document
 - Billing
-Process Running
 - Sales order
 - Delivery
-Process Running
 - Billing
 - Summary
-SD and BW/BI
-SD and FI
-SD and MM

C. FI
- G/L
- A/P
- A/R
- AA
- CO
- FI and SD
- FI and MM
- FI and HR
- FI and report
.....................

D. BW/BI
- Legacy System
 - Build up L/S and DB structure
 - Data Anlyist
 - Fill in Data
- Setup SAP System
 - ASAP methodology 
 - Transform in SAP BW/BI
 - Blueprint
- Data model 
 - Sales information
 - Custumor information
 - Revenue information
 - Extract data from R/3 to BW/BI
- Routines
 - Start routines
 - End routines
 - ABAP routines in BW/BI transformation
- Do R/3 extractor enhancement 
- Customize web reports and Report Designer
- Test
 - Testing tool
 - HP Loadrunner
 - Cut-over
 - Test menu/documents/scripts
- Trouble-shooting
 - BW/BI Full authorization and special authorization
 - Bug and Debug
- Transport 

E. HR/HCM
- OM
- TM
- PR
- PA
- ESS/MSS
- TEST
- HR Trouble-shooting
- HR and Basis
- HR Payroll and FI
......................
 

SAP project step by step

Step 1 Build up legacy system/ DB structure

Step 2 After data is ready, maybe in paper document, analysis and build data model / database structure.

Step 3 Fill in the data in legacy sys
Fill in the data or import data into database.

Step 4 Fill in the data in legacy sys
Fill in the data or import data into database.

Step 5 Analysis on legacy data for the purpose to migrate data into SAP.

Step 6 Cleansing
Validate and make sure data are proper for import into SAP

Step 7 Set up in SAP sys
Set up in SAP to build up a Company application, making sure legacy data will be covered

Step 8 .........................................
Step 9.........................................
Step 10.......................................
Step 11......................................
Step 12.....................................
Step 13.....................................
Step 14.........................................
Step 15........................................
Step 16.......................................
Step 17......................................
Step 18........................................
Step 19........................................
Step 20..........................................

NECC SAP Project History, Accomplishment and Characteristics

A. History 

Since initially introduced SAP ABAP project classes in 2002, NECC has developed a comprehensive profile of project team training, which reflect industry best practice through simulating the real world projects and working environment= s as demanded by corporate world. Having well recognized by SAP community and student, our SAP project classes integrate various functional modules, vers= ions and diverse tools for development and configuration, provide opportunities = to practice their newly acquired SAP knowledge and obtain broad experience and efficiency in SAP area.

So far, NECC project training profile has included
-ABAP Project class (introduced in 2002)
- HR 4.7 Project class (2004)
- BW Project class (2005)
- MM and SD Project class (2005)
- FI/CO Project class (2007)
- SAP Migration class started (2008)
- SAP SD MM FI CO HR BW BI Fundamental Project (2008)
- SAP Advance Integration Project (2009).

Through these programs, we are able to help our students compete successfully in the challenging world, thereby gain a wonderful career in life as well.

 

B. Accomplishment

During a period of 6 years, NECC trained a great number of excellent SAP consultan= ts, who are specialized in SD, MM, BW, ABAP, FICO and HR. From only 2 out of 10 graduates employed in 2002 to more than 60 out of over 100 in 2007, as employment rate is growing exponentially, NECC have accumulated an excellent reputation in SAP training field. As we respect individual attention and privacy, our graduates express sincere appreciation to their instructor and= the school. 

Throughout years, we never fail to protect personal information of our successful graduates from abuse, and put solid efforts to assist them in obtaining a meaningful job. According to our graduates, by studying in the project clas= ses, we not only have acquired fundamental SAP knowledge and practical skills, b= ut also have been treated respectfully and squarely.

People always like to ask our graduates such a question as: “how did you deal with interview questions related to working experience?”. The most probable response would be: “For this, you can always count on instructors and professional in NECC”.

 

C. Characteristics

Since 2002, from R/3 4.6 to 4.7, then to ECC6.0; from BW3.0 to BW 3.5 to BI 7.0; = and from Upgrade project to Migration project to Integration Project; from establishing a QA environment to DEV to Sandbox, from Production Server to = Open System, NECC SAP Project profile has covered over 80% project types and implementation scenarios. It offers a practical, case-based, and customized solution and caters to special needs from individuals with various backgrou= nds accordingly. As a result, our students are able to grow themselves as confi= dent SAP specialist. A great number of our successful cases demonstrate that NECC SAP Project classes are the best we could offer to students with desire of pursuing careers in SAP area.

Since 2008, based on existing conditions, NECC SAP project training further exten= ds the connections between diverse functions. For each project class, we desig= nate a professional team which constitute of a project management specialist, a = SAP function consultant and a professional lecturer, to develop, design and mon= itor every project. SAP SD Migration Project is such a comprehensive proposal offering you a great benefit to land a job. In this project, our student wi= ll learn how to sign the contract with customer from beginning, double check technical documentation, make sure customer requirement, write the blue pri= nt of the customer system, and real project background environment of project system. Within Microsoft system to migrate to SAP system, monitor whole of = the project processing, implementation and final testing. Within SAP system how= to use the testing tools and other tools, for example LSMW, manual of unit tes= t, and make documentation of project, in limited period to finish a real SAP migration project.

NECC SAP Basis Team Project Support

- BI70 BO MM SD HR FI CO ABAP BASIS Certified Instructors   = 10 person
- Six Team Leaders and Tutors
- Team Work
- Materials
- Remote System including in Sandbox, DEV, QA, PRO SIX SERVER
- 24X 7 Remote System Service through Internet including in SAP R/3 4.6C 4.7 ECC6.0 and BW 3.0 BW 3.5 BI 7.0
- Ticket Center and Two Basis Team Support
- SAP Time Management System
- Fix Resume and Interview Training and Job Adviser Service
- Seneca College and Other Public College Employment resource Service
- One-On-One Employment Coach and Adviser Service
- Government support and Co-op plan support and placement support
- SAP MM SD FI CO BW BI HR ABAP certification simulation test service

 


 
Home | Careers | Contact us | About us | Partners
   © 2009 NECC TEKNOLOGY,Inc. All Rights Reserved.